Case details
Bluebook Citation
Omaha v. Hammond, 94 U.S. 98
Full caption
Omaha v. Hammond.
Country
United States
Jurisdiction
Federal
Court
Supreme Court of the United States
Omaha v. Hammond.
Where a contract, entered into by a city for the construction of certain public works, provides that they shall be completed under the supervision and to the satisfaction of an officer of the city, his action, in finally accepting them, is an announcement of his decision that the terms of the contract have been complied with, and is binding upon the city.
Error to the Circuit Court of the United States for the District of Nebraska.
The facts are stated in the opinion of the court.
Submitted on printed arguments by Mr. S. A. Strickland for the plaintiff in error, and by Mr. E. Wakely for the defendant in error.
Mr. Justice Miller delivered the opinion of the court.
The defendant in error, plaintiff below, sued the city of Omaha on a contract for the construction of two public wells in the streets of that city. The contract was in writing, and by its terms plaintiff was “to sink and construct two wells, . . . said wells to be circular, twelve feet in diameter, and to be curbed with a brick wall nine inches in thickness, and arched over in a secure and proper manner, the who e t completed under the supervision and to the satisfaction o e chief engineer of the fire department of said city.
For this work the city was to pay plaintiff “one hun re o lars for each and every one thousand gallons o wa er each of said wells shall be capable of producing, and sha p duce, within twenty-four hours; the capacity o sai w be tested by the chief engineer of the fire department of the city of Omaha aforesaid. And upon the repor ® ® being made to the council of said city, showing
are completed and satisfactory, and also showing the amount of water that said well or wells will produce in twenty-four hours, the said party of the first part shall be entitled to and shall receive from the said party of the second part the said sum, to be paid in city warrants.”
These extracts from the agreement are all that are necessary to the decision of the case.
The plaintiff proved the construction of the wells under the supervision of the engineer to his entire satisfaction, and his final acceptance of them. But it was also proved that, while the main part of the wells was sunk to the depth of twenty to twenty-three feet of the diameter of twelve feet, the brick curbing of nine inches in thickness, built inside the shaft so sunk, reduced this diameter to ten and a half feet, and that smaller shafts of four or five feet in diameter were sunk below the bottom of the main well to the depth of several feet. These two circumstances constitute the defence of the city.
As to both of them, we think the city is concluded by the action of its own officer, the engineer, who was also, by the terms of the contract, authorized by the parties to it to decide these questions.
It may be conceded that there is room for doubt, whether t e wells were to be twelve feet in diameter after they were completed by the building of the curbing, or were to be twelve eet in diameter when the shaft was first sunk, and the nine inc curbing built inside was not to be taken into the account n ascertaining the diameter. The language, we think, rather avors the latter construction. But, if there is an ambiguity, it st e resolved in favor of plaintiff, because the officer of the ci y, under whose supervision the wells were built, must have ? e C0ns^ruc^0n’ an(I authorized the plaintiff to build und a ^5 con^rac^» as the wells were necessarily built er his immediate supervision and control, and could only be aPPr°val. Both parties, then, may bound by an(^ acte(l 011 this construction, and are
shaft« Pl^nc^P^e applies with added force to the smaller nothin^ * eePer than the main ones. There is absolutely n e contract on this subject. The depth of the well, [p. 100] 100' West Wisconsin Railway Co. v. Foley. [Sup. Ct.
the propriety of auxiliary shafts, or any other matter tending to increase the flow of water, were left absolutely to the engineer. The whole work was to be done under his supervision and to his satisfaction. It is proved that the depth of the main shaft was determined by him in referents to the length of the hose to be inserted in it. Ar^ the^^ahxiliary shaft was also sunk under, his direction an^with approval. The city cannot now complain that it^as dq^8 as ^directed.
The instructions o^^e ^<yurt ^^e in accord with these views, and they are not because the judge added to this action of the engm^r, a^^hding the city, the further fact of their acceptance aim us ^Jot the wells. Whether the fact had any significance or not, they were cetainly bound by the action of the engineer.
It was also of no consequence that the court refused to instruct the jury “that if the plaintiff did not construct said wells according to the terms of his contract, he cannot recover, even though the wells have been used by the authorities of the city, because, as to the only matters in dispute, the engineer had by the contract been constituted the arbiter, and had decided in
Judgment affirmed.
the plaintiff’s favor.