Water Co. v. Ware, 83 U.S. (16 Wall.) 566
Full caption
Water Company v. Ware.
Country
United States
Jurisdiction
Federal
Court
Supreme Court of the United States
Water Company v. Ware.
Where an incorporated company undertook to lay water-pipes in a city, agreeing that it would “ protect all persons against damages by reaso of excavations made by them in laying pipes, and to be responsible fo all damages which may occur by reason of the neglect of their emp oy
*
Parsons on Notes and Bills, 501. j- McLemore v. Powell, 12 Wheaton, 554.
the premisesheld, on the company’s having let the work out to a subcontractor, through the negligence of whose servants injury accrued to a person passing over the street, that the company could be properly sued for damages.
Error to the Circuit Court for Minnesota; the case being thus:
The city of St. Paul, desiring to have water-pipes laid along the streets of the city, passed an ordinance authorizing the St. Paul Water Company, an incorporated company, so to lay them. But as it was necessary that large excavations of the earth should be made along the streets, and considerable blasting of rock below, the ordinance in one of its sections, the 6th, thus provided :
“The said water company expressly agrees to protect all persons against damages by reason of excavations made by them in the said city, in laying pipes, and to keep the said excavations properly guarded by day and night, and to become responsible for all damages which,may occur by reason of the neglect of their employes in the premises, and that the streets and highways in said city shall not be unnecessarily obstructed or incumbered in laying said pipes.”
The water company accepted the ordinance. It did not, owever, do any work itself or by its own servants, but made a contract in writing with one Gilfillan to do the wo! < fol them. Under this contract, Gilfillan himself super-1 a ^ie work every day, certain excavations, drillings, DW1 were made in different streets of the city.
1 e these, operations were going on in one of the s, a ceitain Ware, driving his horse and wagon in it, st }njnie(^’ QWmg to his horse taking fright at a wasm 11 street, put there to drill the rocks that it set ii CeSS^r^ remove, and suddenly and without notice a»es accordingly sued the company for dam-
the no ’ '?nesses haymg given evidence tending to show that not “nr en^was °"mg to the fact that the excavations were Pei y guaided and that the highways were “ [p. 568] unnecessarily obstructed and incumbered,” disclosed in cross-examination the fact above mentioned, to wit, that the company did not do any work itself or by its servants, but that it had farmed out its engagement to lay the pipes, and that all that had happened, had happened while the contractor was thus in the discharge of his contract.
Thereupon (the plaintiff resting) the defendant asked the court
“To direct the jury to return a verdict for the defendant, without requiring the defendant to enter upon a defence, upon the ground that the negligence, if any, found as the cause of injury to plaintiff, was the negligence of the servants and employés of said contractor, and not of the defendant or any of its servants and employés.”
This motion the court denied, saying:
“The action is brought upon the principle which is settled, at least in the Federal courts, that when a person (company or corporation included) is engaged in a work, in the ordinary doing of which a nuisance necessarily occurs, the person is liable for any injury that may result to third parties from carelessness or negligence, though the work may be done by a contractor, and although the plaintiff might have sustained an action against the city of St. Paul, it is his right to seek his remedy against the party who created the nuisance.”
The defendant then gave evidence to show that the plaintiff had been driving carelessly, and, the case being rested, asked the court to charge—
“1. That under the evidence in the case they must find a verdict for the defendant. •
“2. That if the injury complained of was caused solely by the negligence or misconduct in the manner of doing the woik o the employés of the contractor, then the defendant is entitle to a verdict.’’
The court refused to give either chargej and the defend ant excepted. Verdict and judgment having been given for the plaintiff, $2200, the defendant brought the case heie.
Argument for the party injured.
Mr. W. H. Peckham, for the plaintiff in error:
The court below proceeded upon the theory either that under the contract between the water company and its contractor, the persons employed by the contractor to do the work, were the servants of the company, and that the company was therefore liable for their misconduct or negligence; or that having caused the work to be done, it was liable for such misconduct or negligence, though the relation of master and servants did not exist between it and the persons doing the work.
But the legal relation of master and servants did not exist between the water company and the persons in charge of the machinery and doing the work. They were in the employ of the contractor. He was exercising an independent employment, and was their superior.* A party is not liable for the misconduct or negligent acts of the employes ot one to whom he lets a job of work to be done by contract. his is settled by the New York case of Blake v. Ferris,^
and by other cases.J
Mr. M. Lamprey, contra:
The case of Storrs v. 1 he City of Utica§ is in point, and the reasoning of the court seems particularly applicable to this
e. lake v. Ferris, cited on the other side, is reviewed, and the doctrine that the city is not liable for injuries e y negligence in the improvement of streets, because has employed a contractor to do the work, is distinctly overruled. J
But we need not enter on any discussion whatever of nat formerly vexed question. Such a discussion is wholly
necessaiy, and in view of other grounds on which the
York,°222-hKellv7PTh M Pennsylvania State,’
t 5 New York, 48.
C»mpan, 23 lows^tcl^ch8 8r,J,’ 849 ’ Oallaha11 »■ Burlington Bailroad
i 17 Nw t ’ <* “*> C“y ’• 2 Black., 418.
PaCk The May°r> &c., 8 New
ay°r’ ’’ ” Ib< 432; Painter v‘ Pittsburgh, 46
Restatement of the case in theopinion.
court below doubtless rested its views—grounds alike obvious and impregnable—such a discussion might be called irrelative.
The effect of section six of the ordinance, which is both an agreement with the public and a law, is to make the water company liable, when injury results from negligence of an employé, whether such employé is a contractor or workman. The company agrees to protect all persons against damages by means of excavations; to keep the excavations properly guarded; to become responsible for all damages; and not to unnecessarily obstruct the streets. It cannot rid itself from the primary liability imposed by this ordinance, by letting the work to a contractor. The liability exists, no matter how the work is done. The contractor is an employé of the company within the meaning of this section.
Reply: 1. The ordinance was intended solely for the indemnity of the city, and one not a party to it can derive no rights under it.
2. The water company, under the ordinance, did not agree to become responsible for the misconduct of the persons doing the work, but only for damages “ by reason of excavations,” and “ to keep such excavations properly guarded,’ and to become responsible for all damages which might occur “ by reason of the neglect of their employés in the premises; that is, by reason of the neglect of its employés to keep its excavations properly guarded. The object of the provision was to bind the company to do, in respect to the public sheets, what, as between the city and the public, would be piimaii y the duty of the city to do. The only change it made between the city and the company was to give to the ci y a contract right to hold the company for any damages it mig be compelled to pay, by reason of the existence of the exca vations in the street.
Mr. Justice CLIFFORD delivered the opinion of the court. Injuries of a physical nature were received by the pl»1
Restatement of the case in the opinion.
tiff through an obstruction in one of the public streets of the city of St. Paul, occasioned, as he alleges, by an employé of the corporation defendants, for whose acts they are responsible, and he instituted the present suit to recover compensation for those injuries. Service was made, and the defendants appeared, and the parties went to trial, and the verdict and judgment were for the plaintiff; and the defendants excepted and sued out this writ of error.
Evidence was introduced by the plaintiff tending to show that where the accident occurred was a public street of the city; that the defendants entered into an engagement with the authorities of the city to make the necessary excavations in the streets, and to lay therein suitable pipes and complete the work as stipulated in a certain contract, to introduce a supply of w’ater into the city for the use of the inhabitants, and that their employe or contractor was at work at the time making the excavations and laying the pipes; that the excavations in the street where the plaintiff was injured extended from the intersection of Eighth Street to the intersection of Ninth Street, and that the excavation with the eiû ankments made on the sides of the same by throwing out the earth, occupied the greater part of the width of the s reet, leaving on the east side little more than a passageway of sufficient width for a one-horse carriage; that in M mg the excavation the workmen found it necessary to nil and blast, employing the steam drill for drilling, and as as usual, with gunpowder; that the engine which v M 6 drill Was three in diameter and was eleatth fX °l SeVen a^ove the surface of the ground, and into 6 U-le accideut to the plaintiff it stood near the olainffflOn ®j^th Street with the street in which the son w PafriHg’ that the plaintiff, with one other pertnrnoJ I11 a carriage drawn by one horse, and having occnrr Street into the street where the accident was driv’t 6 with the other person in the carriage, side of th00 T °n£ d°Wa the uarrow passageway, on the east suddpnh 6 8 I66*’ w^en the persons in charge of the engine y, and without giving any notice or warning of their
Restatement of the case in the opinion.
intention, set the engine and drill in operation, causing a loud noise which frightened the plaintiff’s horse and caused him to shy and turn upon the sidewalk, overturning the carriage and injured the plaintiff
Due care, it is alleged, was used by the plaintiff, as when ho left the intersecting street and passed into the street where the accident occurred the engine and drill were not in operation, nor was there any barricade or signal of any kind to indicate that there was any danger, or that any special precaution was necessary except what was suggested by the embankment and the narrowness of the street; and the evidence also tended to prove that neither the engine nor the drill was seen by the plaintiff or by the person in the carriage with him until the horse of the plaintiff was within ten feet of the place where the engine and drill were situated, and that it was at that moment that they were put in operation by those in charge of the work, and that one of the workmen ran into the street and threw up his arms as if to stop the horse, which had the effect to make him still more unmanageable.
Having introduced evidence tending to prove the foregoing facts the plaintiff rested, and the defendants move the court to direct the jury to return a verdict in their favoi upon the ground, that the negligence proved, if any, as t e cause of the injury to the plaintiff was the negligence o t e contractor in charge of the work, or his servants 01 em ployes, and not of the defendants, or their servants 01 em ployes, which motion the court then and there denied, an remarked that “the action is brought upon the piincipe, which is well settled in the Federal courts, that wheie a Pe son or corporation is engaged in a work in the ordinary 01^ of which a nuisance necessarily occurs, the paity is ia for any injury that may result to third parties from caie ness or negligence, even though the work may be oi a contractor,” and it makes no difference even if t e p • , in a case like the present, might sustain an action ao the municipal corporation, as it is his right to see i edy against the party who created the nuisance or
mediate employés, to which ruling and decision the defendants then and there excepted.
Testimony was then introduced by the defendants tending to show that the injury mentioned in the declaration was not caused by any neglect or misconduct of the persons in charge of the work, but wholly by the reckless and negligent driving of the plaintiff, and the person with him in the carriage.
Prayers for instruction to the jury were presented by the defendants in substance and effect as follows:
(1.) That the court instruct the jury that upon the whole evidence they must find their verdict for the defendants.
(2.) That if the injury to the plaintiff was caused solely by the negligence or misconduct of the employés of the contractor in doing the work, then the defendants are not liable.
Both of those requests were refused, and the rulings of the court in that behalf, together with the refusal of the court at the close of the plaintiff’s case to direct a verdict for the defendants, present the principal questions in the case for the decision of the court. Other prayers for instrucion, involving the same principles, were also presented by the defendants, which were also refused, and the rulings are embraced in the exceptions.
ities and towns are usually required by statute to keep t eii streets and highways safe and convenient for travellers, if they neglect so to do, in a case where that duty is imposed by law, and suffer the same to get out of repair an defective, and any person as a traveller receives injury rough such defect, either to his person or property, the e inquent corporation is responsible in damages to the inJ ic party. Such a party, however, cannot maintain an ion against the corporation grounded solely on the defect want of repair in the highway, but he must also allege wa the corporation had notice of the defect or iron °t repa*1 and that he was injured, either in person or state Çonsefiuence of the unsafe and inconvenient a dnt e highway, as the duty to repair in such cases is y owe to the public, and consequently if one person [p. 574] might sue for his proportion of the damages for the non-performance of the duty, then every other member of the community would have the same right of action, which ■would be ruinous to the corporation, and for that reason it was held at common law, that no action founded merely on the neglect to repair would lie.*
Nor will an action lie in such a case at the present time; but it is settled law, by the highest authority of the country from which the common law is derived, that where it appears that the corporation is under a legal obligation to repair the way in question, and that such obligation is a matter of general and public concern, and also that the place in question is out of repair and that the plaintiff has sustained some peculiar damage in his person or property by means of such defect or want of repair, that the corporation, if the means of performing the duty to make the repairs are within their control, is liable to compensate the injured party foi the injury which he suffered from their neglect, f Since the decision in Mayor of Lyme-Regis v. Henley, the case last referred to, many decisions to the same effect have been ma e by the State courts in this country approving that rule an applying it in all similar controversies.^
Grant all that and still the defendants deny that the iu e established by those authorities furnishes any support to t e rulings of the Circuit Court, as they, the defendants, were mere contractors to make the excavations and lay the P12*?6®’ and they insist that the persons responsible to the plainti, if any, are the persons whom they employed to do the woi and who were in charge of it at the time the plainti W injured, and they deny that they in any view of the cases ca be held answerable for the neglect and carelessness
*
Weightman v. Washington, 1 Black, 52. Mayor f Henly v. The Mayor, &c., of Lyme, 5 Bingham, 91; 1 e Henly, 3 Barnewall & Adolphus, 77; Mayor, &c., of Lyme-Kegi
who had contracted with them to make the excavations and lay the pipes, and who had charge of the engine and steam drill, the operation of which frightened the horse of the plaintiff.
Concede that proposition and it would follow that the rulings in question are incorrect; but the evidence exhibited in the record shows that the defendants agreed with the municipal authorities to protect all persons against damages by reason of the excavations made by them preparatory to laying the pipes, and to keep the work properly guarded by day and night, and to be responsible for all damages which “may occur by reason of neglect of their employés in the premises,” and that the streets should not be unnecessarily obstructed or incumbered in doing the work. Such an agreement would not acquit the municipality of an obligation, otherwise attaching, to keep the streets safe and convenient for travellers, but it may well be held that a party injured through a defect or want of repair in such a street, occasioned by the neglect or carelessness of such a contractor in doing the work, or of those for whose acts he is responsible, may, at his election, sue the contractor. for redress or pursue his remedy against the municipality, as it is clear that the contractor, in case of a recovery against the latter, would be answerable to the municipality as stipulated in his agreement. Improvements of the kind, such as making excavations and laying pipes for gas or for sewers, are made y municipal corporations, under circumstances where the corporation is immediately responsible for the defect or want o repair in the street, without any other party being answeiable over to them, for any damages they may have to Pay to a traveller who may be injured through such a defect or want of repair, as where they appoint their own superin-Oth eUt an^ W01^ *8 ^°ne by their order and directions.
er cases arise where improvements are constructed by ntractois, in which the municipality is not responsible at > as wheie the improvement is of such a character that a u ent man would not find it necessary to incumber or ob-ruc t le street in any respect or for any purpose, as in that [p. 576] case it would be clear that the defect or want of repair which occasioned the injury was solely the result of neglect and carelessness on the part of the contractor, and not of any culpable fault of the officers of the municipality. Contractors with such a corporation for such a purpose may or may not be responsible to a third party, in a case like the present, according to the circumstances, but it is not necessary to enter much into the discussion of that topic in this case, as the evidence shows that the defendants agreed to become responsible for all damages which may occur by reason of neglect of their employes in the premises. Tested by these considerations it is quite "clear that the case must be viewed just as it would be if the work had been done by the defendants, and not by the sub-contractors, or as if the work had in all respects been done under the directions of the defendants as the immediate contractors with the municipal corporation.
Where the obstruction or defect caused or created in the street is purely collateral to the work contracted to be done, and is entirely the result of the wrongful acts of the contractor or his workmen, the rule is that the employer is not liable; but where the obstruction or defect which occasioned the injury results directly from the acts which the contractor agreed and was authorized to do, the person who employs the contractor and authorizes him to do those acts is equa y liable to the injured party.* Exactly the same view was a vanced by this court when that case was brought heie y the first writ of error, in which the court said that if t e nuisance necessarily occurs in the ordinary mode of doing the work the occupant or owner is -liable, but if it is the negligence of the contractor or his servants, t en should alone be responsible.-!" Common justice iequiies t enforcement of that rule, as if the contractor does the thin„ which he is employed to do the employer is as for the thing as if he had done it himself, but i t e which is the subject of complaint is purely collateia 0
*
Robbins v. Chicago, 4 Wallace, 679. t Chicago v. Robbins, 2 Black, 428.
Syllabus.
matter contracted to be done, and arises indirectly in the course of the performance of the work, the employer is not liable, because he never authorized the work to be done.* It would be monstrous, said Lord Campbell, if a party causing another to do a thing were exempted from liability for the act merely because there was a contract between him and the person immediately causing the act to be done, which may be accepted as correct if applied in a case where the work contracted to be done will necessarily, in its progress, render the street unsafe and inconvenient for public travel.f More than one party may be liable in such a case, nor can one who employs another to make such an excavation relieve himself from liability for such damages as those involved in the case before the court by any stipulation with his employé, as both the person who procured the nuisance to be made and the immediate author of it are liable.| Apply these rules to the case before the court, and it is clear that they are sufficient to dispose of all the exceptions and to show that there is no error in the record.
Judgment affirmed.
*
Hole v. Railway Co., 6 Hurlstone & Norman, 497. Id. 124-8Lowell °pS'-iC°'’ 2 E1HS & BIackburne» 770; Newton. Ellis, ft Lowell v. Railroad, 23 Pickering, 31. Cate, 8 Bosworthal23NrW Y°rk’ 108' Hartmann, 29 Id. 591; Same
18
Id 84 • «I ’ COn§reVe V- Smith’18 New Y°rk, 79; Same v. Mor-3 Hill, 616; MiKoTXt^ Mayor. Furze, VOL. XVI.